Corley Energy Check MW availability

I · Speed to power

Firm power for AI compute, years before the grid.

Corley Energy builds power foundries. Dedicated behind-the-meter generation that converts stranded Permian gas into contracted power for AI data centers. Online in months, not queue years.

Check MW availability
Speed to power first. Scale by repetition.

II · What we deliver

Behind the meter, ahead of the queue.

Generation built with the data center on abundant West Texas natural gas. No interconnection request. No cluster study. No years in line. Firm, contracted power, energized on the buildout's schedule.

WEST TEXAS GAS BEHIND THE METER FIRM POWER

The grid is optional. The deadline is not.

II · Continued

Megawatts, with a date attached.

i · Contracted capacity

Blocks of firm power.

Dedicated generation sized to the load and contracted for the long term. Committed pricing, committed dates, and a structure a credit committee can approve.

ii · On-site generation

Generation with the compute.

Built on the same ground as the data center, fueled by firm West Texas gas contracted at the source. The interconnection dependency never exists, so the queue never applies.

iii · Speed to energization

Months, not cycles.

Siting, permitting, gas, and EPC run as parallel workstreams on a templated design. Energization is measured in months, and the date is contractual, not aspirational.

III · Working with Corley

From conversation to energization.

Discovery.

Load profile, timeline, and growth path. One working session establishes fit and surfaces the capacity blocks available.

Commitment · None

LOI · Due diligence.

Site, gas supply, and schedule open to diligence. An LOI reserves the capacity block while terms take shape.

Commitment · LOI

Signed PPA.

A long-term power purchase agreement with committed pricing and committed dates. The schedule becomes contractual here.

Commitment · PPA

Construction.

EPC mobilizes on the templated design while the data center build proceeds in parallel. Milestones stay visible end to end.

Execution · Months

Energized · Operational.

Commissioned, firm, operating, with an expansion path already sited. Power flows behind the meter.

Firm power · Delivered

IV · The next step

Speed to power first. Scale by repetition.

Capacity blocks and delivery windows are specific, and they move. The fastest way to firm power is to ask what is available, and when.

Check MW availability